Spot
Tap or click each unsafe area on the photograph. Two or three defects per lift.
Site manager training programme
Four system-scaffold lifts. Twelve non-compliances. Click every defect you would record on a weekly inspection against NASC SG guidance and the Work at Height Regulations 2005.
4 lifts · 12 recorded defects · untimed · click the photograph
Tap or click each unsafe area on the photograph. Two or three defects per lift.
Every hit is logged as a finding with the SG / WAHR clause you would cite on site.
Debrief each lift, then take a graded inspection report — green, amber or red.
System scaffold · proprietary

Working lift over public pavement · 3-lift independent
3 non-compliances

Second-lift cantilever bay · materials handling
3 non-compliances

Ground to first lift · soft ground
3 non-compliances

Four-lift independent · inner hop-up
3 non-compliances
Memorise these figures. They are the lines you are inspecting to — not a manufacturer’s preference.
Training aid only. Aligned to NASC SG4, SG6, SG10, SG25, SG28, TG20 and the Work at Height Regulations 2005. Always follow the system manufacturer’s manual and the scaffold design on the job in front of you. This is not a substitute for CISRS inspection training.